Building a garage is a significant investment that can greatly enhance the value and functionality of your property. Whether you’re planning a simple 2 car garage, a custom garage with added features, or a detached garage for an RV, one of the most common questions we get at Arizona Garage Builders is, “How long will it take?”
While the timeline for building a garage can vary based on several factors, here’s a general breakdown of what to expect during each phase of the construction process.

1. Initial Planning and Design (1-3 Weeks)

The first step in building a garage is planning and design. During this phase, you’ll work with our team to define your vision, establish a budget, and create a detailed design that meets your needs. This stage includes:
• Consultation: Discussing your needs, preferences, and the purpose of the garage.
• Design Development: Creating blueprints and selecting materials.
• Permit Application: Submitting plans to local authorities for approval.
This phase typically takes between 1 to 3 weeks, depending on the complexity of the design and the time required to obtain necessary permits.

2. Permitting and Approvals (2-8 Weeks)

Obtaining permits and approvals is an essential part of the garage-building process. Depending on your location and the scope of the project, this step can take anywhere from 2 to 8 weeks.
• Permit Review: Local authorities review the design plans to ensure they comply with zoning laws and building codes.
• Adjustments: If needed, adjustments are made to the plans based on feedback from the permitting authority.
The time required for permitting can vary widely depending on local regulations and the complexity of the project.

3. Site Preparation and Foundation Work (1-2 Weeks)

Once the permits are in place, construction can begin. The first step is preparing the site and laying the foundation.
• Site Clearing and Grading: The area where the garage will be built is cleared and graded to ensure proper drainage.
• Foundation Installation: A concrete slab is poured, which typically takes a few days to complete, with additional time for curing.
This stage usually takes about 1 to 2 weeks, depending on the weather and site conditions.

4. Framing and Roofing (2-4 Weeks)

With the foundation in place, the framing of the garage begins, followed by the installation of the roof.
• Framing: The walls and roof structure are built, which can take 1 to 2 weeks.
• Roof Installation: The chosen roofing material, such as asphalt shingles or metal roofing, is installed.
This phase generally takes 2 to 4 weeks, depending on the size and complexity of the garage.

5. Exterior Finishes and Siding (1-2 Weeks)

After the framing and roofing are complete, the exterior of the garage is finished.
• Siding Installation: Siding materials, such as vinyl, wood, or brick, are installed.
• Doors and Windows: Garage doors, entry doors, and windows are installed.
This stage typically takes 1 to 2 weeks.

6. Interior Finishes (2-4 Weeks)

The final stage of construction involves finishing the interior of the garage, which includes:
• Electrical and Plumbing Work: Installing electrical outlets, lighting, and any plumbing fixtures.
• Insulation and Drywall: Insulating the walls and installing drywall.
• Custom Features: Adding any custom features, such as cabinetry, shelving, or a workbench.
Depending on the complexity of the interior finishes, this phase can take 2 to 4 weeks.

7. Final Inspection and Walkthrough (1 Week)

Before the project is completed, a final inspection is conducted to ensure that all work meets building codes and your specifications.
• Inspection: Local authorities may perform a final inspection to verify compliance with permits.
• Client Walkthrough: Our team will walk you through the completed garage, ensuring everything meets your expectations.
This final phase typically takes about 1 week.

Total Timeline: 9-20 Weeks

In total, building a garage can take anywhere from 9 to 20 weeks, depending on the complexity of the project, weather conditions, and the speed at which permits are obtained. While the process may seem lengthy, careful planning and attention to detail ensure that your new garage is built to the highest standards.

Final Thoughts

At Arizona Garage Builders, we understand that timing is crucial when it comes to construction projects. We work closely with our clients to create a realistic timeline that meets your needs while ensuring the highest quality of work. Whether you’re building a simple 2 car garage, a custom garage with living quarters, or a detached RV garage, we’re here to guide you through every step of the process.
If you’re ready to start your garage-building journey, contact us today! We’ll help you turn your vision into reality with a garage that’s built to last.

Facebook
Twitter
LinkedIn
Pinterest
Get A Quote For Your New Garage

We prepare your estimate for your new construction project with absolutely no obligation or cost. We prepare all of the calculations and 3d renderings for your project so you know what Arizona Garage Builders can do for you. We will prepare your proposal online so you can see it from any device..

Follow us on
Facebook
Pinterest
Twitter