If you can dream it, we can build it!

Proposal For Mr. and Mrs. Roeser

Thank you for the opportunity to bid your project.

Arizona Garage Builders has an evident vision to be the best RV Garage & Casita designers, and builders. From conception to the final build results, we strive to be the number one builders in all of Arizona.

Providing the highest quality designs, builds, and finished product partnered with second-to-none customer service has developed that vision into reality.  We strive to exceed client expectations with every Garage & Casita we build every time, without fail.

For The Amount Of $155,128

Luxe Development Group Inc DBA Arizona Garage Builders will perform the following:

We will build a 396 sq. ft. detached casita with 10' ceilings and a 47 sq ft covered patio.

Permits and Fees:

  • Client already has plans and will be paying for permits themselves.
  • Typically, Luxe Development Group Inc. DBA Arizona Garage Builders shall complete permit applications and make submissions to the municipality for all building and mechanical permits required.  Standard permit fees have been excluded and will be billed as a change order upon request per the municipality. 

Blue Stake

Site:

  • Requirement by the state of Arizona to check for underground utilities before we dig.

Termite Pre-Treatment:

  • Ground will be pre-treated prior to construction and is included in pricing with a 3 year warranty.

Grading and Excavation:

  • Excavate for foundation per architectural plan drawings and all excavated soils to be stockpiled for use during back fill. Unsuitable soil conditions at, or above, plan bottom are unknowns and cannot be budgeted for prior to excavation. ie. Rock, soft clays, sinkholes, etc. these will incur additional costs of $225 per hour.

 

  • It is unknown whether or not we will require fill dirt in order to bring your new build to meet county requirements. As such, Luxe Development Group Inc. DBA Arizona Garage Builders cannot include any fill related items into the original bid, as each build and area are unique. Any fill needed to bring your building to level will be charged as a change order at $225 per hour plus $24 per ton for fill dirt.

 

  • Builder will back fill foundation with existing excavated soils. Excess soils shall be graded out on property if possible, if not possible to grade out, expenses for hauling off-site any excess soils will be charged to the client at $225 an hour plus dump fees.

 

  • Luxe Development Group Inc DBA Arizona Garage Builders Inc. will not be held responsible for damage to or replacement of irrigation lines, sprinkler lines, water lines, gas lines, electric lines, pool lines, phone lines or cable TV lines not shown on blue stake prior to excavation.

 

  • If we get into a HARD DIG situation, client will be responsible for extra costs associated with hard dig.

Concrete:

  • Poured concrete per engineered plans to include #4 rebar, forms, footings and slab. 

Exterior Doors:

  • 1 – 60″ x 80″ French Doors, $1200 allowance

Interior Doors:

  • 2 – 2480 Six panel hollow core door
  • 1 – 2680 Six panel hollow core door
  • Door Allowance $400 for all 3 doors.

Framing:

  • All lumber and framing materials sized and spaced per approved construction drawings. Materials, where applicable, to be kiln dried.
  • Wall sheathing shall be oriented strand board installed per code using H clips where applicable. 2×6 Construction.

Baseboards:

  • Baseboard Allowance, $400
  • 29/64 in. x 3-1/4 in. PVC Composite White Colonial Base Molding, Durable white finish resists dents and scratches. Does not crack, split or warp

Interior Painting:

  • Color choice of client (Behr Paint)
  • Single interior color

Exterior Painting:

  • Color choice of client (Behr Paint)
  • Single trim color and single body color

Windows:

  • 2 – 3020 Fixed Energy Shield Low E windows
  • 1 – 2026 Fixed Energy Shield Low E window
  • 1 – 2650 Single Hung Energy Shield Low E window
  • 1 – 2640 Single Hung Energy Shield Low E window
  • Window trim colors are black, almond, or white.

Roofing:

  • Tile to match existing home as close as possible per engineered plans

Electrical:

  • 13 – 110v GFI outlets
  • 10 – LED canister lights
  • 1 – 220v GFI outlets 
  • 1 – 100 amp sub- panel
  • 1 – Exterior Sconce lights ($60 allowance per unit)
  • 1 – Ceiling Fan Pre Wire. Client to provide ceiling fan.
  • 1 – Bathroom vanity light fixture, $85 allowance
  • 1 – Wall sconce light, $35 allowance
  • 1 – Panel upgrade from 200 to 400 amp
  • Pulling and trenching of electrical lines will be billed at $25 per foot plus cost of materials.

Plumbing:

  •  Install 1- Water Softener system. $2,000 allowance towards system and installation.
  • Install 1 – Hose bib

Mechanical:

  • Install 1- 1.5 ton Midea/Goodman AC system with up to 6 registers to include manufacture warranty.

Exterior Finish:

  • Knock down stucco finish to match home as close as possible.  Pop outs are included in proposal.
  • $3,500 allowance towards brick veneer of client’s choice.  Allowance to include $2,000 for materials and $1,500 for installation.

Insulation:

  • Install – Open cell spray foam insulation on the Roof deck 5.5″ and interior walls 3.5″ Spray foam insulation is superior to batt insulation and helps with keeping you cooler in the summer and warmer in the winter.

Drywall:

  • All drywall to be installed with screws in the field, perimeter nails, taped and finished to a level 3 finish (knockdown).  Square corners are standard.  Bullnose corners are included.
  • Rounded interior archways included.

Kitchenette:

  • $1,400 Allowance on cabinets and counter-tops, anything above the client pays difference.
  • Hampton Bay Cabinets (White, Gray, Mocha)
  • Granite Countertops
  • Appliances NOT included 

Bathroom:

  • Install 1 – UltraMax II 1-Piece 1.28 GPF Single Flush Elongated Toilet with CeFiONtect in Cotton White, $550 allowance
  • Install 1 – Tiled Shower. Shower door not included.
  • Install 1 – Rheems Performance 18 kW Self-Modulating 3.51 GPM Tankless Electric Water Heater ($450 Allowance)
  • Install 1 – Base vanity with sink ($500 allowance, anything above the client pays difference)
  • Install 1 – Bathroom vanity mirror.  $150 allowance
  • Install 1 – Rain Shower Head Faucet, $300 allowance.

Fire Sprinkler System:

  • Allowance of $3,500 towards sprinkler system. 

Block Wall:

  • 80′  of block wall installed.
  • 4′ tall x 5′ long block wall around air handler.
  • Painting of block wall, price to be determined.
  • Demo of 60′ of existing block wall and removal of debris is included.

Flooring:

  • $6,000 allowance for Engineered Hardwood Flooring. $4000 allowance for engineered hardwood flooring and materials. $2000 allowance for installation. 
  • Radiant flooring is excluded from proposal.

Tile:

  • Bathroom Floor Tile: Client credit of $850 and choice of tile. This is to include installation costs. (Anything above client pays the difference.)
  • $600 allowance for materials, $250 allowance for installation.
  • Bathroom Shower Tile: Client credit of $2200 and choice of tile.  This is to include installation costs. (Anything above client pays the difference.) 
  • $600 allowance for materials, $1600 for installation.

Trenching:

  • For trenching and pulling of electrical lines, plumbing lines, gas lines, water lines etc. there will be a charge of $25 per ft. plus materials. This is based on having a clear run (no obstacles) such as concrete, brickwork, pavers, trees etc. this would incur additional fees at $225 per hour for labor and equipment.

  • If Hand-trenching is required, this is billed at $75 per ft plus materials.

Your Project Management

We Use Buildertrend

Buildertrend is online as a website and also as an app for Apple and Android devices. You can use it to keep track of all the activities during your project 

Your Own User panel on your phone or desktop

Pay your progress payments within the app

Always see the progress of your project’s schedule

Make change orders right from the app, easy peasy.

See images and video throughout the process

Access the app 24/7 so you can be in the know

Excellent skills & Quality work

Our every client every time satisfaction guarantee gives our clients peace of mind throughout the entire garage design and build process. We are not happy if you are not satisfied with every step towards your new garage.

For further inquiries call US

(+623) 254-5599

Reach out to our team today for a no-obligation 3D rendering and consultation.

Our testimonials

What people says about us !!

When you hire Arizona Garage Builders you’re going to get people that will work hard to make sure that you 100% happy with your new construction project.